# §503.32. Lack of alternate fuel supply at a cost which does not substantially exceed the cost of using imported petroleum.

- (a) **Eligibility.** [Section 212(a)(1)](/cfr/10/212.md?p=a-1) (A)(ii) of the Act provides for a permanent exemption due to lack of an alternate fuel supply at a cost which does not substantially exceed the cost of using imported petroleum. To qualify a petitioner must certify that:
  - (1) A good faith effort has been made to obtain an adequate and reliable supply of an alternate fuel for use as a primary energy source of the quality and quantity necessary to conform with the design and operational requirements of the proposed unit;
  - (2) The cost of using such a supply would substantially exceed the cost of using imported petroleum as a primary energy source during the useful life of the proposed unit as defined in [§ 503.6](/cfr/10/503.6.md) (cost calculation) of these regulations;
  - (3) No alternate power supply exists, as required under [§ 503.8](/cfr/10/503.8.md) of these regulations.
  - (4) Use of mixtures is not feasible, as required under [§ 503.9](/cfr/10/503.9.md) of these regulations; and
  - (5) Alternative sites are not available, as required under [§ 503.11](/cfr/10/503.11.md) of these regulations.
- (b) **Evidence required in support of a petition.** The petition must include the following evidence in order to make the demonstration required by this section:
  - (1) Duly executed certifications required under [paragraph (a)](#a) of this section;
  - (2) Exhibits containing the basis for certifications required under [paragraph (a)](#a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption);
  - (3) Environmental impact analysis, as required under [§ 503.13](/cfr/10/503.13.md) of these regulations;
  - (4) Fuels search, as required under [§ 503.14](/cfr/10/503.14.md) of these regulations; and
  - (5) All data required by [§ 503.6](/cfr/10/503.6.md) (cost calculation) of these regulations necessary for computing the cost calculation formula.

## Notes

### Amendments

[46 FR 59903, Dec. 7, 1981, as amended at 47 FR 15315, Apr. 9, 1982; 54 FR 52895, Dec. 22, 1989]

### Authority

Authority: Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. § 7101 et seq. ); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3289 (42 U.S.C. 8301 et seq. ); Energy Security Act, Pub. L. 96-294, 94 Stat. 611 (42 U.S.C. 8701 et seq. ); E.O. 1209, 42 FR 46267, September 15, 1977.