# S. 2276 — what changed

S. 2276, Protecting our Infrastructure of Pipelines and Enhancing Safety Act of 2016 — 17 sections amended and 10 added between Reported in Senate and Engrossed in Senate.

Edits are marked `<del>struck</del>` and `<ins>inserted</ins>`.

## Section 1 Short title; table of contents; references

- (a) Short title— This Act may be cited as the “Securing America’s Future Energy: Protecting our Infrastructure of Pipelines and Enhancing Safety Act” or the “SAFE PIPES Act”.
- (b) <ins>Table of contents—</ins> <ins>The table of contents of this Act is as follows:</ins>
- (c) [was (3)] References to title 49, United States Code— Except as otherwise expressly provided, wherever in this Act an amendment or repeal is expressed in terms of an amendment to, or repeal of, a section or other provision, the reference shall be considered to be made to a section or other provision of title 49, United States Code.

## Sec. 2 Authorization of appropriations

- (a) Gas and hazardous liquid— Section 60125(a) is amended—
  - (1) in paragraph (1), by striking “there is authorized to be appropriated to the Department of Transportation for each of fiscal years 2012 through 2015, from fees collected under section 60301, $90,679,000, of which $4,746,000 is for carrying out such section 12 and $ 36,194,000 is for making grants.” and inserting the <del>following:</del><ins>following: “there are authorized to be appropriated to the Department of Transportation from fees collected under section 60301—</ins>
    - “(A) $127,060,000 for fiscal year 2016, of which $9,325,000 shall be expended for carrying out such section 12 and $42,515,000 shall be expended for making grants;
    - “(B) $129,671,000 for fiscal year 2017, of which $9,418,000 shall be expended for carrying out such section 12 and $42,941,000 shall be expended for making grants;
    - “(C) $132,334,000 for fiscal year 2018, of which $9,512,000 shall be expended for carrying out such section 12 and $43,371,000 shall be expended for making grants; and
    - “(D) $135,051,000 for fiscal year 2019, of which $9,607,000 shall be expended for carrying out such section 12 and $43,805,000 shall be expended for making grants.”
  - (2) in paragraph (2), by striking “there is authorized to be appropriated for each of fiscal years 2012 through 2015 from the Oil Spill Liability Trust Fund to carry out the provisions of this chapter related to hazardous liquid and section 12 of the Pipeline Safety Improvement Act of 2002 (49 U.S.C. 60101 note; Public Law 107–355), $18,573,000, of which $2,174,000 is for carrying out such section 12 and $4,558,000 is for making <del>grants” </del><ins>grants.” </ins>and inserting the <del>following:</del><ins>following: “there are authorized to be appropriated from the Oil Spill Liability Trust Fund to carry out the provisions of this chapter related to hazardous liquid and section 12 of the Pipeline Safety Improvement Act of 2002 (49 U.S.C. 60101 note; Public Law 107–355)—”</ins>
    - “(A) $19,890,000 for fiscal year 2016, of which $3,108,000 shall be expended for carrying out such section 12 and $8,708,000 shall be expended for making grants;
    - “(B) $20,288,000 for fiscal year 2017, of which $3,139,000 shall be expended for carrying out such section 12 and $8,795,000 shall be expended for making grants;
    - “(C) $20,694,000 for fiscal year 2018, of which $3,171,000 shall be expended for carrying out such section 12 and $8,883,000 shall be expended for making grants; and
    - “(D) $21,108,000 for fiscal year 2019, of which $3,203,000 shall be expended for carrying out such section 12 and $8,972,000 shall be expended for making grants.”
- (b) Emergency response grants— Section 60125(b)(2) is amended by striking “2012 through 2015” and inserting “2016 through 2019”.
- (c) <del>One-Call </del><ins>One-call </ins>notification programs— Section 6107 is amended—
  - (1) in subsection (a), by striking “$1,000,000 for each of fiscal years 2012 through 2015” and inserting “$1,060,000 for each of the fiscal years 2016 through 2019”; and
  - (2) in subsection (b), by striking “2012 through 2015” and inserting “2016 through 2019”.
- (d) State damage prevention programs— Section 60134(i) is amended by striking “2012 through 2015” and inserting “2016 through 2019”.
- (e) Community pipeline safety information grants— Section 60130(c) is amended by striking “2012 through 2015” and inserting “2016 through 2019”.
- (f) Pipeline integrity program— Section 12(f) of the Pipeline Safety Improvement Act of 2002 (49 U.S.C. 60101 note) is amended by striking “2012 through 2015” and inserting “2016 through 2019”.

## Sec. 3 Regulatory updates

- (a) In general— Not later than 120 days after the date of enactment of this Act, and every 90 days thereafter until a final rule has been issued for each of the requirements described under paragraphs (1), (2), and (3), the Secretary of Transportation shall <del>submit a report to the Committee on Commerce, Science, and Transportation of the Senate and the Committee </del><ins>publish an update </ins>on <del>Transportation and Infrastructure of the House of Representatives </del><ins>a public website </ins>regarding the status of a final rule for—
  - (1) regulations required under the Pipeline Safety Regulatory Certainty and Job Creation Act of 2011 (Public Law 112–90; 125 Stat. 1904) for which no interim final rule or direct final rule has been issued;
  - (2) any regulation relating to pipeline safety required by law, other than a regulation described under paragraph (1), for which for more than 2 years after the date of the enacting statute or statutory deadline no interim final rule or direct final rule has been issued; and
  - (3) any other <ins>pipeline safety </ins>rulemaking categorized as significant.
- (b) Contents— Each report under subsection (a) shall include—
  - (1) a description of the work plan for the outstanding regulation;
  - (2) an updated rulemaking timeline for the outstanding regulation;
  - (3) current staff allocations;
  - (4) <ins>any other information collection request with substantial changes;</ins>
  - (5) [was (3)(6)] current data collection or research relating to the development of the rulemaking;
  - (6) [was (3)(7)] current collaborative efforts with safety experts and other stakeholders;
  - (7) [was (3)(8)] any resource constraints impacting the rulemaking process for the outstanding regulation; and
  - (8) [was (3)(9)] any other details associated with the development of the rulemaking that impact the progress of the rulemaking.

## Sec. 4 Hazardous materials identification numbers

- The Administrator of the Pipeline and Hazardous Materials Safety Administration <del>shall prioritize the use of Pipeline and Hazardous Materials Safety Administration resources for the completion of each outstanding statutory requirement for a rulemaking described in a report under section 3 before beginning any new rulemaking required after the date of the enactment of this Act unless the Secretary of Transportation certifies to Congress that there is a significant need to move forward with a new rulemaking.</del><ins>shall—</ins>
- (1) <ins>rescind the implementation of the June 26, 2015 PHMSA interpretative letter (#14–0178); and</ins>
- (2) <ins>reinstate paragraphs (4) and (5) of section 172.336(c) of title 49, Code of Federal Regulations, without the reference to “gasohol”, as was originally intended in the March 7, 2013 final rule (PHMSA–2011–0142).</ins>

## Sec. 5 Statutory preference

- <ins>The Administrator of the Pipeline and Hazardous Materials Safety Administration shall prioritize the use of Office of Pipeline Safety resources for the development of each outstanding pipeline safety statutory requirement, including requirements for rulemakings and information collection requests, for a rulemaking described in a report under section 3 before beginning any new rulemaking required after the date of the enactment of this Act unless the Secretary of Transportation certifies to Congress that there is a significant need to move forward with a new rulemaking.</ins>
- (a) <del>Report—</del> <del>Not later than 18 months after the publication of a final rule regarding the safety of gas transmission pipelines (76 Fed. Reg. 53086), the Comptroller General shall submit a report to Congress regarding the natural gas integrity management program.</del>
- (b) <del>Contents—</del> <del>The report under subsection (a) shall include—</del>
  - (1) <del>an analysis of the extent to which the natural gas integrity management program under section 60109(c) of title 49, United States Code, has improved the safety of natural gas transmission pipelines;</del>
  - (2) <del>an analysis or recommendations regarding changes to the program that would prevent inadvertent releases from pipelines and mitigate any adverse consequences of an inadvertent release, including changes to the current definition of high consequence area, or would expand integrity management beyond high consequence areas;</del>
  - (3) <del>a review of the cost effectiveness of the legacy class location regulations;</del>
  - (4) <del>an analysis of and recommendations regarding what impact the age of a pipeline should have on risk analysis of a particular pipeline;</del>
  - (5) <del>a description of any challenges affecting Federal or State regulators in their oversight of the program and how the challenges are being addressed; and</del>
  - (6) <del>a description of any challenges affecting the natural gas industry in complying with the program, and how the challenges are being addressed.</del>
- (c) <del>Definition of high consequence area—</del> <del>In this section and in section 6, the term high consequence area means an area described in section 60109(a) of title 49, United States Code.</del>

## Sec. 6 Natural gas integrity management review

- (a) <del>Safety study—</del><ins>Report—</ins> Not later than 18 months after the publication of a final rule regarding the safety of <del>hazardous liquid </del><ins>gas transmission </ins>pipelines <del>(80 </del><ins>(76 </ins>Fed. Reg. <del>61610), </del><ins>53086), </ins>the Comptroller General <ins>of the United States </ins>shall submit a report to Congress regarding the <del>hazardous liquid </del><ins>natural gas </ins>integrity management program.
- (b) Contents— The report under subsection (a) shall include—
  - (1) an analysis of the extent to which <del>liquid pipeline </del><ins>the natural gas </ins>integrity management <del>in high consequence areas for operators of certain hazardous liquid pipeline facilities, as regulated </del><ins>program </ins>under <del>sections 195.450 and 195.452 </del><ins>section 60109(c) </ins>of title 49, <del>Code of Federal Regulations, </del><ins>United States Code, </ins>has improved the safety of <del>hazardous liquid </del><ins>natural gas transmission </ins>pipelines;
  - (2) <ins>an analysis or </ins>recommendations, including consideration of technical, operational, and economic feasibility, regarding changes to the program that <del>could </del><ins>would </ins>prevent inadvertent releases from pipelines and mitigate any adverse consequences of an inadvertent release, including changes to the current definition of high consequence <del>area;</del><ins>area, or would expand integrity management beyond high consequence areas;</ins>
  - (3) <del>an analysis </del><ins>a review </ins>of <del>how surveying, assessment, mitigation, and monitoring activities, including real-time hazardous liquid pipeline monitoring during significant flood events and information sharing with other Federal agencies, are being used to address risks associated with </del>the <del>dynamic and unique nature </del><ins>cost effectiveness </ins>of <del>rivers, flood plains, and lakes;</del><ins>the legacy class location regulations;</ins>
  - (4) an analysis of and recommendations regarding what impact pipeline features and conditions, including the age, condition, materials, and construction of a <del>pipeline </del><ins>pipeline, </ins>should have on risk analysis of a particular <del>pipeline and what changes to the definition of high consequence area could be made to improve pipeline safety; and</del><ins>pipeline;</ins>
  - (5) a description of any challenges affecting Federal or State regulators in their oversight of the program and how the challenges are being <del>addressed.</del><ins>addressed; and</ins>
  - (6) <ins>a description of any challenges affecting the natural gas industry in complying with the program, and how the challenges are being addressed.</ins>
- (c) <ins>Definition of high consequence area—</ins> <ins>In this section and in section 7, the term high consequence area means an area described in section 60109(a) of title 49, United States Code.</ins>

## Sec. 7 Hazardous liquid integrity management review

- (a) <ins>Safety study—</ins> <ins>Not later than 18 months after the publication of a final rule regarding the safety of hazardous liquid pipelines (80 Fed. Reg. 61610), the Comptroller General of the United States shall submit a report to Congress regarding the hazardous liquid integrity management program.</ins>
- (b) <ins>Contents—</ins> <ins>The report under subsection (a) shall include—</ins>
  - (1) <ins>an analysis of the extent to which liquid pipeline integrity management in high consequence areas for operators of certain hazardous liquid pipeline facilities, as regulated under sections 195.450 and 195.452 of title 49, Code of Federal Regulations, has improved the safety of hazardous liquid pipelines;</ins>
  - (2) <ins>recommendations, including consideration of technical, operational, and economic feasibility, regarding changes to the program that could prevent inadvertent releases from pipelines and mitigate any adverse consequences of an inadvertent release, including changes to the current definition of high consequence area;</ins>
  - (3) <ins>an analysis of how surveying, assessment, mitigation, and monitoring activities, including real-time hazardous liquid pipeline monitoring during significant flood events and information sharing with other Federal agencies, are being used to address risks associated with the dynamic and unique nature of rivers, flood plains, and lakes;</ins>
  - (4) <ins>an analysis of and recommendations regarding what impact pipeline features and conditions, including the age, condition, materials, and construction of a pipeline, should have on risk analysis of a particular pipeline and what changes to the definition of high consequence area could be made to improve pipeline safety; and</ins>
  - (5) <ins>a description of any challenges affecting Federal or State regulators in their oversight of the program and how the challenges are being addressed.</ins>
- <del>Section 60115(b)(4)(A) is amended by striking “State commissioners. The Secretary shall consult with the national organization of State commissions before selecting those 2 individuals.” and inserting “State officials. The Secretary shall consult with national organizations representing State commissioners or governors when making a selection under this subparagraph.”.</del>

## Sec. 8 Technical safety standards committees

- <ins>Section 60115(b)(4)(A) is amended by striking “State commissioners. The Secretary shall consult with the national organization of State commissions before selecting those 2 individuals.” and inserting “State officials. The Secretary shall consult with national organizations representing State commissioners or governors when making a selection under this subparagraph.”</ins>
- (a) <del>In general—</del> <del>Not later than 30 days after the completion of a pipeline safety inspection, the Administrator of the Pipeline and Hazardous Materials Safety Administration, or the head of the agency leading the inspection, shall—</del>
  - (1) <del>conduct a post-inspection briefing with the operator outlining concerns, and to the extent practicable, provide written preliminary findings of the inspection; or</del>
  - (2) <del>issue to the operator a final report, notice of amendment of plans or procedures, safety order, or corrective action order.</del>
- (b) <del>Report—</del> <del></del>
  - (1) <del>In general—</del> <del>The Administrator shall submit an annual report to Congress regarding—</del>
    - (A) <del>the actions that the Pipeline and Hazardous Materials Safety Administration has taken to ensure that inspections by State authorities provide effective and timely oversight; and</del>
    - (B) <del>statistics relating to the timeliness of the actions described in paragraphs (1) and (2) of subsection (a).</del>
  - (2) <del>Cessation of effectiveness—</del> <del>Paragraph (1) shall cease to be effective on September 30, 2019.</del>

## Sec. 9 Inspection report information

- (a) <del>Study—</del><ins>In general—</ins> <del>The Secretary </del><ins>Not later than 30 days after the completion </ins>of <del>Transportation, in consultation with stakeholders, shall conduct </del>a <del>study on improving damage prevention through technological improvements in location </del><ins>pipeline safety inspection, the Administrator of the Pipeline </ins>and <del>communications practices to prevent accidental excavation damage to a pipe </del><ins>Hazardous Materials Safety Administration, </ins>or <del>its coating, including considerations </del><ins>the State authority certified under section 60105 </ins>of <del>technical, operational, and economic feasibility.</del><ins>title 49, United States Code, shall—</ins>
  - (1) <ins>conduct a post-inspection briefing with the operator outlining concerns, and to the extent practicable, provide written preliminary findings of the inspection; or</ins>
  - (2) <ins>issue to the operator a final report, notice of amendment of plans or procedures, safety order, or corrective action order, or such other applicable report, notice, or order.</ins>
- (b) <ins>Report—</ins> <ins></ins>
  - (1) <ins>In general—</ins> <ins>The Administrator shall submit an annual report to Congress regarding—</ins>
    - (A) <ins>the actions that the Pipeline and Hazardous Materials Safety Administration has taken to ensure that inspections by State authorities provide effective and timely oversight; and</ins>
    - (B) <ins>statistics relating to the timeliness of the actions described in paragraphs (1) and (2) of subsection (a).</ins>
- (b) <del>Contents—</del> <del>The study under subsection (a) shall include—</del>
  - (2) <ins>Cessation of effectiveness—</ins> <del>an identification of any methods that could improve damage prevention through location and mapping data in an effort </del><ins>Paragraph (1) shall cease </ins>to <del>reduce unintended releases caused by excavation;</del><ins>be effective on September 30, 2019.</ins>
  - (2) <del>an analysis of how increased use of GPS digital mapping technologies, predictive analytic tools, public awareness initiatives, including one-call initiatives, the use of mobile devices, and other advanced technologies could supplement existing one-call notification and damage prevention programs to reduce the frequency and severity of incidents caused by excavation damage;</del>
  - (3) <del>an analysis of the feasibility of a national data repository for pipeline excavation accident data that creates standardized data models for storing and sharing pipeline accident information; and</del>
  - (4) <del>an identification of opportunities for stakeholder engagement in preventing excavation damage.</del>
- (c) <del>Report—</del> <del>Not later than 1 year after the date of the enactment of this Act, the Secretary of Transportation shall submit a report to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives regarding the study under this section, including recommendations, that include the consideration of technical, operational, and economic feasibility, on how to incorporate technological improvements and practices that may help prevent accidental excavation damage.</del>

## Sec. 10 Pipeline odorization study

- <ins>Not later than 180 days after the date of the enactment of this Act, the Comptroller General of the United States shall submit a report to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives that assesses—</ins>
- (1) <ins>the feasibility of odorizing all combustible gas in transportation;</ins>
- (2) <ins>the impacts of the odorization of all combustible gas in transportation on manufacturers, agriculture, and other end users; and</ins>
- (3) <ins>the relative benefits and costs associated with odorizing all combustible gas in transportation, including impacts on health and safety, compared to using other methods to mitigate pipeline leaks.</ins>
- (a) <del>Review—</del> <del>Not later than 1 year after the date of the enactment of this Act, the Administrator of the Pipeline and Hazardous Materials Safety Administration shall submit to Congress a review of Pipeline and Hazardous Materials Safety Administration staff resource management, including geographic allocation plans, hiring challenges, and expected retirement rates and strategies. The review shall include recommendations to address hiring challenges, training needs, and any other identified staff resource challenges.</del>
- (b) <del>Critical hiring needs—</del> <del></del>
  - (1) <del>In general—</del> <del>Beginning on the date on which the review is submitted under subsection (a), the Administrator may certify to Congress, not less frequently than annually, that a severe shortage of qualified candidates or a critical hiring need exists for a position or group of positions in the Pipeline and Hazardous Materials Safety Administration.</del>
  - (2) <del>Direct hire authority—</del> <del>Notwithstanding sections 3309 through 3318 of title 5, United States Code, the Administrator, after making a certification under paragraph (1), may hire a candidate for the position or candidates for the group of positions, as applicable.</del>
  - (3) <del>Terminations of effectiveness—</del> <del>The direct hire authority provided under paragraph (2) shall terminate on September 30, 2019.</del>

## Sec. 11 Improving damage prevention technology

- (a) <del>In general—</del><ins>Study—</ins> <del>In developing a research and development program plan under paragraph (3) of section 12(d) of the Pipeline Safety Improvement Act of 2002 (49 U.S.C. 60101 note), the Administrator </del><ins>The Secretary </ins>of <del>the Pipeline and Hazardous Materials Safety Administration, </del><ins>Transportation, </ins>in consultation with <del>the Assistant Secretary for Research </del><ins>stakeholders, shall conduct a study on improving existing damage prevention programs through technological improvements in location, mapping, excavation, </ins>and <del>Technology, shall—</del><ins>communications practices to prevent accidental excavation damage to a pipe or its coating, including considerations of technical, operational, and economic feasibility and existing damage prevention programs.</ins>
  - (1) <del>detail compliance with the consultation requirement under paragraph (2) of such section;</del>
  - (2) <del>provide opportunities for joint research ventures with non-Federal entities, whenever practicable and appropriate, to leverage limited Federal research resources; and</del>
  - (3) <del>permit collaborative research and development projects with appropriate non-Federal organizations.</del>
- (b) <del>Collaborative safety research report—</del><ins>Contents—</ins> <del>Section 60124(a)(6) is amended—</del><ins>The study under subsection (a) shall include—</ins>
  - (1) <ins>an identification of any methods that could improve existing damage prevention programs through location and mapping practices or technologies </ins>in <del>subparagraph (A), </del><ins>an effort to reduce unintended releases caused </ins>by <del>striking “and” at the end;</del><ins>excavation;</ins>
  - (2) <del>in subparagraph (B), by striking </del><ins>an analysis of how increased use of GPS digital mapping technologies, predictive analytic tools, public awareness initiatives including one-call initiatives, </ins>the <del>period at </del><ins>use of mobile devices, and other advanced technologies could supplement existing one-call notification and damage prevention programs to reduce </ins>the <del>end </del><ins>frequency </ins>and <del>inserting “; and”; and</del><ins>severity of incidents caused by excavation damage;</ins>
  - (3) <del>by adding at the end the following:</del><ins>an identification of any methods that could improve excavation practices or technologies in an effort to reduce pipeline damages;</ins>
  - (4) <ins>an analysis of the feasibility of a national data repository for pipeline excavation accident data that creates standardized data models for storing and sharing pipeline accident information; and</ins>
  - (5) <ins>an identification of opportunities for stakeholder engagement in preventing excavation damage.</ins>
- (c) <ins>Report—</ins> <ins>Not later than 1 year after the date of the enactment of this Act, the Secretary of Transportation shall submit a report to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives regarding the study under this section, including recommendations, that include the consideration of technical, operational, and economic feasibility, on how to incorporate, into existing damage prevention programs, technological improvements and practices that may help prevent accidental excavation damage.</ins>
    - <del>“(C) research activities in collaboration with non-Federal entities, including the intended improvements to safety technology, inspection technology, operator response time, and emergency responder incident response time.”</del>

## Sec. 12 Workforce of Pipeline and Hazardous Materials Safety Administration

- (a) <del>In general—</del><ins>Review—</ins> Not later than <del>180 days </del><ins>1 year </ins>after the date of the enactment of this Act, the <del>Secretary </del><ins>Administrator </ins>of <del>Transportation </del><ins>the Pipeline and Hazardous Materials Safety Administration </ins>shall <del>convene a working group </del><ins>submit </ins>to <del>consider the development of </del><ins>Congress </ins>a <del>voluntary no-fault information sharing system to encourage collaborative efforts to improve inspection information feedback and information sharing with the purpose </del><ins>review </ins>of <del>improving natural gas transmission </del><ins>Pipeline </ins>and <del>hazardous liquid pipeline integrity risk analysis.</del><ins>Hazardous Materials Safety Administration staff resource management, including geographic allocation plans, hiring challenges, and expected retirement rates and strategies. The review shall include recommendations to address hiring challenges, training needs, and any other identified staff resource challenges.</ins>
- (b) <ins>Critical hiring needs—</ins> <ins></ins>
  - (1) <ins>In general—</ins> <ins>Beginning on the date on which the review is submitted under subsection (a), the Administrator may certify to Congress, not less frequently than annually, that a severe shortage of qualified candidates or a critical hiring need exists for a position or group of positions in the Pipeline and Hazardous Material Safety Administration.</ins>
- (b) <del>Membership—</del> <del>The working group described in subsection (a) shall include representatives from—</del>
  - (2) <ins>Direct hire authority—</ins> <ins>Notwithstanding sections 3309 through 3318 of title 5, United States Code, </ins>the <del>Pipeline and Hazardous Materials Safety Administration;</del><ins>Administrator, after making a certification under paragraph (1), may hire a candidate for the position or candidates for the group of positions indicated in the certification, as applicable.</ins>
  - (3) <ins>Terminations of effectiveness—</ins> <del>industry stakeholders, including operators of pipeline facilities, inspection technology vendors, and pipeline inspection organizations;</del><ins>The direct hire authority provided under paragraph (2) shall terminate on September 30, 2019.</ins>
  - (3) <del>safety advocacy groups;</del>
  - (4) <del>research institutions;</del>
  - (5) <del>State public utility commissions or State officials responsible for pipeline safety oversight;</del>
  - (6) <del>State pipeline safety inspectors; and</del>
  - (7) <del>labor representatives.</del>
- (c) <del>Considerations—</del> <del>The working group described in subsection (a) shall consider and provide recommendations, if applicable, to the Secretary on—</del>
  - (1) <del>the need for and the identification of a system to ensure that dig verification data is shared with inline inspection operators to the extent consistent with the need to maintain proprietary data in a confidential manner to improve pipeline safety and inspection technology;</del>
  - (2) <del>ways to encourage the exchange of pipeline inspection information and the development of advanced pipeline inspection technologies and enhanced risk analysis;</del>
  - (3) <del>opportunities to share data, including dig verification data between operators of pipeline facilities and in-line inspector vendors to expand knowledge of the advantages and disadvantages of the different types of in-line inspection technology and methodologies;</del>
  - (4) <del>options to create a secure system that protects proprietary data while encouraging the exchange of pipeline inspection information and the development of advanced pipeline inspection technologies and enhanced risk analysis; and</del>
  - (5) <del>regulatory, funding, and legal barriers to sharing the information described in paragraphs (1) through (4).</del>
- (d) <del>FACA—</del> <del>The working group shall not be subject to the Federal Advisory Committee Act (5 U.S.C. App.).</del>
- (e) <del>Publication—</del> <del>The Secretary shall publish the recommendations provided under subsection (c) on a publicly available website.</del>

## Sec. 13 Research and development

- (a) <del>Report—</del><ins>In general—</ins> <del>Not later than 18 months after the date </del><ins>In developing a research and development program plan under paragraph (3) </ins>of <del>the enactment </del><ins>section 12(d) </ins>of <del>this Act and subject to subsection (c), </del>the <del>Secretary </del><ins>Pipeline Safety Improvement Act </ins>of <del>Transportation shall submit a report to Congress on </del><ins>2002 (49 U.S.C. 60101 note), </ins>the <del>feasibility </del><ins>Administrator </ins>of <del>a national integrated pipeline safety regulatory inspection database to improve communication and collaboration between </del>the Pipeline and Hazardous <del>Materials </del><ins>Material </ins>Safety <del>Administration </del><ins>Administration, in consultation with the Assistant Secretary for Research </ins>and <del>State pipeline regulators.</del><ins>Technology, shall—</ins>
  - (1) <ins>detail compliance with the consultation requirement under paragraph (2) of such section;</ins>
  - (2) <ins>provide opportunities for joint research ventures with non-Federal entities, whenever practicable and appropriate, to leverage limited Federal research resources; and</ins>
  - (3) <ins>permit collaborative research and development projects with appropriate non-Federal organizations.</ins>
- (b) <del>Contents—</del><ins>Collaborative safety research report—</ins> <del>The report under subsection (a) shall include—</del><ins>Section 60124(a)(6) is amended—</ins>
  - (1) <del>a description of any efforts currently underway to test a secure information-sharing system for the purpose described </del>in <del>subsection (a);</del><ins>subparagraph (A), by striking “and” at the end;</ins>
  - (2) <del>a description of any progress </del>in <del>establishing common standards for maintaining, collecting, and presenting pipeline safety regulatory inspection data, and a methodology for </del><ins>subparagraph (B), by striking </ins>the <del>sharing of </del><ins>period at </ins>the <del>data;</del><ins>end and inserting “; and”; and</ins>
  - (3) <del>a description of any existing inadequacies or gaps in State and Federal inspection, enforcement, geospatial, or other pipeline safety regulatory inspection data;</del><ins>by adding at the end the following:</ins>
    - <ins>“(C) research activities in collaboration with non-Federal entities, including the intended improvements to safety technology, inspection technology, operator response time, and emergency responder incident response time.”</ins>
  - (4) <del>a description of the potential safety benefits of a national integrated pipeline database; and</del>
  - (5) <del>recommendations for how to implement a secure information-sharing system for the purpose described in subsection (a).</del>
- (c) <del>Consultation—</del> <del>In preparing the report under subsection (a), the Secretary shall consult with stakeholders, including each State authority operating under a certification to regulate intrastate pipelines under section 60105 of title 49, United States Code.</del>

## Sec. 14 Information sharing system

- (a) <del>Definition of underground natural gas storage facility—</del><ins>In general—</ins> <del>In </del><ins>Not later than 180 days after the date of the enactment of </ins>this <del>section, </del><ins>Act, </ins>the <del>term underground natural gas storage facility means </del><ins>Secretary of Transportation shall convene </ins>a <del>gas pipeline facility (as defined in section 60101 </del><ins>working group to consider the development </ins>of <del>title 49, United States Code) that stores </del><ins>a voluntary no-fault information sharing system to encourage collaborative efforts to improve inspection information feedback and information sharing with the purpose of improving natural </ins>gas <del>in an underground facility, including—</del><ins>transmission and hazardous liquid pipeline integrity risk analysis.</ins>
  - (1) <del>a depleted hydrocarbon reservoir;</del>
  - (2) <del>an aquifer reservoir; or</del>
  - (3) <del>a solution mined salt cavern reservoir.</del>
- (b) <del>Minimum uniform safety standards—</del><ins>Membership—</ins> <del>Not later than 2 years after the date of the enactment of this Act, the Secretary of Transportation, </del><ins>The working group described </ins>in <del>consultation with the heads of other relevant Federal agencies, </del><ins>subsection (a) </ins>shall <del>issue minimum uniform safety standards, incorporating, to the extent practicable, consensus standards for the operation, environmental protection, and integrity management of underground natural gas storage facilities.</del><ins>include representatives from—</ins>
  - (1) <ins>the Pipeline and Hazardous Materials Safety Administration;</ins>
  - (2) <ins>industry stakeholders, including operators of pipeline facilities, inspection technology vendors, and pipeline inspection organizations;</ins>
  - (3) <ins>safety advocacy groups;</ins>
  - (4) <ins>research institutions;</ins>
  - (5) <ins>State public utility commissions or State officials responsible for pipeline safety oversight;</ins>
  - (6) <ins>State pipeline safety inspectors; and</ins>
  - (7) <ins>labor representatives.</ins>
- (c) Considerations— <del>In developing the uniform safety standards under </del><ins>The working group described in </ins>subsection <del>(b), </del><ins>(a) shall consider and provide recommendations, if applicable, to </ins>the Secretary <del>shall—</del><ins>on—</ins>
  - (1) <del>consider </del>the <del>economic impacts of </del><ins>need for and </ins>the <del>regulations on individual gas customers </del><ins>identification of a system </ins>to <ins>ensure that dig verification data is shared with inline inspection operators to </ins>the extent <del>practicable;</del><ins>consistent with the need to maintain proprietary and security sensitive data in a confidential manner to improve pipeline safety and inspection technology;</ins>
  - (2) <del>ensure that the regulations do not have a significant economic impact on end users </del><ins>ways </ins>to <ins>encourage </ins>the <del>extent practicable; and</del><ins>exchange of pipeline inspection information and the development of advanced pipeline inspection technologies and enhanced risk analysis;</ins>
  - (3) <del>consider existing consensus standards.</del><ins>opportunities to share data, including dig verification data between operators of pipeline facilities and in-line inspector vendors to expand knowledge of the advantages and disadvantages of the different types of in-line inspection technology and methodologies;</ins>
  - (4) <ins>options to create a secure system that protects proprietary data while encouraging the exchange of pipeline inspection information and the development of advanced pipeline inspection technologies and enhanced risk analysis; and</ins>
  - (5) <ins>regulatory, funding, and legal barriers to sharing the information described in paragraphs (1) through (4).</ins>
- (d) <del>Certifications—</del><ins>FACA—</ins> The <del>Secretary may authorize an intrastate underground natural gas storage safety program by a State authority that annually submits a certification </del><ins>working group shall not be subject </ins>to the <del>Secretary in the same manner as provided under subsections (b) and (c) of section 60105 of title 49, United States Code.</del><ins>Federal Advisory Committee Act (5 U.S.C. App.).</ins>
- (e) <ins>Publication—</ins> <ins>The Secretary shall publish the recommendations provided under subsection (c) on a publicly available website.</ins>
- (e) <del>Agreements—</del> <del></del>
  - (1) <del>In general—</del> <del>The Secretary may make an agreement, in the same manner as provided in section 60106 of title 49, United States Code, with a State authority authorizing the State authority to take necessary action to provide or participate in the oversight of interstate underground natural gas storage facilities.</del>
  - (2) <del>Rule of construction—</del> <del>Notwithstanding the limitation under section 60104(b) of title 49, United States Code, to the extent a State has oversight of the wellbore piping and hole drilled to connect the surface wellhead with the underground reservoir, the standards adopted under subsection (b) may be enforced by the State.</del>
- (f) <del>Grants—</del> <del>If a State authority with responsibility for regulating gas pipelines in that State under a certification under section 60105 of title 49, United States Code, an agreement under section 60106 of that title, or both, files an application in such form and manner as prescribed by the Secretary not later than September 30 of a calendar year, the Secretary shall pay not more than 80 percent of the cost of the personnel, equipment, and activities the authority reasonably requires during the next calendar year—</del>
  - (1) <del>to carry out an intrastate underground natural gas storage safety program under a certification under subsection (d); or</del>
  - (2) <del>to act as an agent of the Secretary on interstate underground natural gas storage facilities under an agreement under subsection (e).</del>
- (g) <del>User fees—</del> <del></del>
  - (1) <del>In general—</del> <del>A fee shall be imposed on an entity operating an underground natural gas storage facility to which this section applies. Any such fee imposed shall be collected before the end of the fiscal year to which it applies.</del>
  - (2) <del>Means of collection—</del> <del>The Secretary shall prescribe procedures to collect fees under this subsection. The Secretary may use a department, agency, or instrumentality of the United States Government or of a State or local government to collect the fee and may reimburse the department, agency, or instrumentality a reasonable amount for its services.</del>
  - (3) <del>Use of fees—</del> <del></del>
    - (A) <del>Account—</del> <del>There is established an underground natural gas storage facility safety account in the Pipeline Safety Fund established under section 60301 of title 49, United States Code, in the Treasury of the United States.</del>
    - (B) <del>Use of fees—</del> <del>A fee collected under this subsection—</del>
      - (i) <del>shall be deposited in the underground natural gas storage facility safety account; and</del>
      - (ii) <del>if the fee is related to an underground natural gas storage facility, may be used only for an activity related to underground natural gas storage safety under this section.</del>
    - (C) <del>Limitation—</del> <del>Amounts collected under this subsection shall be made available only to the extent provided in advance in an appropriation law for an activity related to underground natural gas storage safety.</del>
- (h) <del>Rules of construction—</del> <del></del>
  - (1) <del>In general—</del> <del>Nothing in this section may be construed to affect any regulation relating to gas pipeline facilities that is in effect on the day before the date of enactment of this Act.</del>
  - (2) <del>Limitations—</del> <del>Nothing in this section may be construed to authorize the Secretary to prescribe the location of an underground natural gas storage facility or to require the Secretary’s permission to construct such a facility.</del>

## Sec. 15 Nationwide integrated pipeline safety regulatory database

- (a) <del>In general—</del><ins>Report—</ins> <del>In preparing or reviewing a response plan under part 194 </del><ins>Not later than 18 months after the date </ins>of <del>title 49, Code </del><ins>the enactment </ins>of <del>Federal Regulations, </del><ins>this Act, </ins>the <del>Administrator </del><ins>Secretary </ins>of <ins>Transportation shall submit a report to Congress on </ins>the <ins>feasibility of a national integrated pipeline safety regulatory inspection database to improve communication and collaboration between the </ins>Pipeline and Hazardous Materials Safety Administration and <del>an operator shall each consider, to the maximum extent practicable, the impact of a worst-case discharge of hazardous liquid, or the substantial threat of such a discharge, into or on any navigable waters or adjoining shorelines that may be covered in whole or in part by ice.</del><ins>State pipeline regulators.</ins>
- (b) <del>Definitions—</del><ins>Contents—</ins> <del>In this section, any applicable definitions set forth in section 194.5 of title 49, Code of Federal Regulations (as in effect on the day before the date of enactment of this Act), </del><ins>The report under subsection (a) </ins>shall <del>apply.</del><ins>include—</ins>
  - (1) <ins>a description of any efforts currently underway to test a secure information-sharing system for the purpose described in subsection (a);</ins>
  - (2) <ins>a description of any progress in establishing common standards for maintaining, collecting, and presenting pipeline safety regulatory inspection data, and a methodology for the sharing of the data;</ins>
  - (3) <ins>a description of any existing inadequacies or gaps in State and Federal inspection, enforcement, geospatial, or other pipeline safety regulatory inspection data;</ins>
  - (4) <ins>a description of the potential safety benefits of a national integrated pipeline database; and</ins>
  - (5) <ins>recommendations for how to implement a secure information-sharing system that protects proprietary and security sensitive information and data for the purpose described in subsection (a).</ins>
- (c) <ins>Consultation—</ins> <ins>In preparing the report under subsection (a), the Secretary shall consult with stakeholders, including each State authority operating under a certification to regulate intrastate pipelines under section 60105 of title 49, United States Code.</ins>

## Sec. 16 Underground natural gas storage facilities

- (a) <ins>Defined term—</ins> <ins>Section 60101(a) is amended—</ins>
  - (1) <ins>in paragraph (21)(B), by striking the period at the end and inserting a semicolon;</ins>
  - (2) <ins>in paragraph (24), by striking “and” at the end;</ins>
  - (3) <ins>in paragraph (25), by striking the period at the end and inserting a semicolon; and</ins>
  - (4) <ins>by adding at the end the following:</ins>
    - <ins>“(27) underground natural gas storage facility means a gas pipeline facility that stores gas in an underground facility, including—</ins>
    - <ins>“(A) a depleted hydrocarbon reservoir;</ins>
    - <ins>“(B) an aquifer reservoir; or</ins>
    - <ins>“(C) a solution mined salt cavern reservoir.”</ins>
- (b) <ins>Standards for underground natural gas storage facilities—</ins> <ins>Chapter 601 is amended by inserting after section 60103 the following:</ins>
  - <ins>“60103A. Standards for underground natural gas storage facilities</ins>
  - <ins>“(a) Minimum uniform safety standards—Not later than 2 years after the date of the enactment of the SAFE PIPES Act, the Secretary of Transportation, in consultation with the heads of other relevant Federal agencies, shall issue minimum uniform safety standards, incorporating, to the extent practicable, consensus standards for the operation, environmental protection, and integrity management of underground natural gas storage facilities.</ins>
  - <ins>“(b) Considerations—In developing uniform safety standards under subsection (a), the Secretary shall—</ins>
  - <ins>“(1) consider the economic impacts of the regulations on individual gas customers to the extent practicable;</ins>
  - <ins>“(2) ensure that the regulations do not have a significant economic impact on end users to the extent practicable;</ins>
  - <ins>“(3) consider existing consensus standards; and</ins>
  - <ins>“(4) consider the recommendations of the Aliso Canyon Task Force under section 27 of the Securing America’s Future Energy: Protecting our Infrastructure of Pipelines and Enhancing Safety Act.</ins>
  - <ins>“(c) User fees</ins>
  - <ins>“(1) In general—A fee shall be imposed on an entity operating an underground natural gas storage facility to which this section applies. Any such fee imposed shall be collected before the end of the fiscal year to which it applies.</ins>
  - <ins>“(2) Means of collection—The Secretary shall prescribe procedures to collect fees under this subsection. The Secretary may use a department, agency, or instrumentality of the United States Government or of a State or local government to collect the fee and may reimburse the department, agency, or instrumentality a reasonable amount for its services.</ins>
  - <ins>“(3) Use of fees</ins>
  - <ins>“(A) Account—There is established an underground natural gas storage facility safety account in the Pipeline Safety Fund established under section 60301, in the Treasury of the United States.</ins>
  - <ins>“(B) Use of fees—A fee collected under this subsection—</ins>
  - <ins>“(i) shall be deposited in the underground natural gas storage facility safety account; and</ins>
  - <ins>“(ii) if the fee is related to an underground natural gas storage facility, may be used only for an activity related to underground natural gas storage safety under this section.</ins>
  - <ins>“(C) Limitation—Amounts collected under this subsection shall be made available only to the extent provided in advance in an appropriation law for an activity related to underground natural gas storage safety.</ins>
  - <ins>“(d) Rules of construction</ins>
  - <ins>“(1) In general—Nothing in this section may be construed to affect any Federal regulation relating to gas pipeline facilities that is in effect on the day before the date of enactment of the SAFE PIPES Act.</ins>
  - <ins>“(2) Limitations—Nothing in this section may be construed to authorize the Secretary—</ins>
  - <ins>“(A) to prescribe the location of an underground natural gas storage facility; or</ins>
  - <ins>“(B) to require the Secretary’s permission to construct a facility referred to in subparagraph (A).”</ins>
- (c) <ins>Clerical amendment—</ins> <ins>The table of sections for chapter 601 is amended by inserting after the item relating to section 60103 the following:</ins>
- <del>The Secretary of Transportation shall revise section 195.6(b) of title 49, Code of Federal Regulations, to explicitly state that the Great Lakes are a U.S.A. ecological resource (as defined in section 195.6(b) of that title) for purposes of determining whether a pipeline is in a high consequence area (as defined in section 195.450 of that title).</del>

## Sec. 17 Joint inspection and oversight

- <del>Not later than 1 year after the date of </del><ins>To ensure </ins>the <del>enactment </del><ins>safety </ins>of <del>this Act, the Comptroller General shall submit a report to Congress on </del><ins>pipeline transportation, </ins>the <del>staffing, resource allocation, oversight strategy, and management </del><ins>Secretary </ins>of <del>the </del>Transportation <del>Security Administration’s pipeline security program and other surface transportation programs. The report </del>shall <del>include information on the coordination between </del><ins>coordinate with States to ensure safety through </ins>the <del>Transportation Security Administration, other Federal stakeholders, and industry.</del><ins>following:</ins>
- (1) <ins>At the request of a State authority, the Secretary shall allow for a certified state authority under section 60105 of title 49, United States Code, to participate in the inspection of an interstate pipeline facility.</ins>
- (2) <ins>Where appropriate, may provide temporary authority for a certified State authority under that section to participate in oversight of interstate pipeline safety transportation to ensure proper safety oversight and prevent an adverse impact on public safety.</ins>

## Sec. 18 Response plans — added

- <ins>In preparing or reviewing a response plan under part 194 of title 49, Code of Federal Regulations, the Administrator of the Pipeline and Hazardous Materials Safety Administration and an operator shall each address, to the maximum extent practicable, the impact of a worse case discharge of oil, or the substantial threat of such a discharge, into or on any navigable waters or adjoining shorelines that may be covered in whole or in part by ice.</ins>

## Sec. 19 High consequence areas — added

- <ins>The Secretary of Transportation shall revise section 195.6(b) of title 49, Code of Federal Regulations to explicitly state that the Great Lakes are a USA ecological resource (as defined in section 195.6(b) of that title) for purposes of determining whether a pipeline is in a high consequence area (as defined in section 195.450 of that title).</ins>

## Sec. 20 Surface transportation security review — added

- <ins>Not later than 1 year after the date of the enactment of this Act, the Comptroller General of the United States shall submit a report to Congress on the staffing, resource allocation, oversight strategy, and management of the Transportation Security Administration’s pipeline security program and other surface transportation programs. The report shall include information on the coordination between the Transportation Security Administration, other Federal stakeholders, and industry.</ins>

## Sec. 21 Small scale liquefied natural gas facilities — added

- (a) <ins>Defined term—</ins> <ins>Section 60101(a), as amended by section 16, is further amended by inserting after paragraph (25) the following:</ins>
  - <ins>“(26) small scale liquefied natural gas facility means a permanent intrastate liquefied natural gas facility (other than a peak shaving facility) that produces liquefied natural gas for—</ins>
  - <ins>“(A) use as a fuel in the United States; or</ins>
  - <ins>“(B) transportation in the United States by a means other than a pipeline facility; and”</ins>
- (b) <ins>Siting standards for permanent small scale liquefied natural gas facilities—</ins> <ins>Section 60103(a) is amended to read as follows:</ins>
  - <ins>“(a) Location standards</ins>
  - <ins>“(1) In general—The Secretary of Transportation shall prescribe minimum safety standards for deciding on the permanent location of a new liquefied natural gas pipeline facility or small scale liquefied natural gas facility.</ins>
  - <ins>“(2) Liquefied natural gas facilities—In prescribing a minimum safety standard for deciding on the permanent location of a new liquefied natural gas facility, the Secretary of Transportation shall consider—</ins>
  - <ins>“(A) the kind and use of the facility;</ins>
  - <ins>“(B) the existing and projected population and demographic characteristics of the location;</ins>
  - <ins>“(C) the existing and proposed land uses near the location;</ins>
  - <ins>“(D) the natural physical aspects of the location;</ins>
  - <ins>“(E) medical, law enforcement, and fire prevention capabilities near the location that can cope with a risk caused by the facility; and</ins>
  - <ins>“(F) the need to encourage remote siting.</ins>
  - <ins>“(3) Small scale liquefied natural gas facilities</ins>
  - <ins>“(A) In general—Not later than 18 months after the date of the enactment of the SAFE PIPES Act, the Secretary of Transportation shall prescribe minimum safety standards for permanent small scale liquefied natural gas facilities.</ins>
  - <ins>“(B) Considerations—In prescribing minimum safety standards under this paragraph, the Secretary shall consider—</ins>
  - <ins>“(i) the value of establishing risk-based approaches;</ins>
  - <ins>“(ii) the benefit of incorporating industry standards and best practices;</ins>
  - <ins>“(iii) the need to encourage the use of best available technology; and</ins>
  - <ins>“(iv) the factors prescribed in paragraph (2), as appropriate.”</ins>

## Sec. 22 Report on natural gas leak reporting — added

- (a) <ins>In general—</ins> <ins>Not later than 1 year after the date of the enactment of this Act, the Administrator of the Pipeline and Hazardous Materials Safety Administration shall submit to Congress a report on the metrics provided to the Pipeline and Hazardous Materials Safety Administration and other Federal and State agencies related to lost and unaccounted for natural gas from distribution pipelines and systems.</ins>
- (b) <ins>Elements—</ins> <ins>The report required under subsection (a) shall include the following elements:</ins>
  - (1) <ins>An examination of different reporting requirements or standards for lost and unaccounted for natural gas to different agencies, the reasons for any such discrepancies, and recommendations for harmonizing and improving the accuracy of reporting.</ins>
  - (2) <ins>An analysis of whether separate or alternative reporting could better measure the amounts and identify the location of lost and unaccounted for natural gas from natural gas distribution systems.</ins>
  - (3) <ins>A description of potential safety issues associated with natural gas that is lost and unaccounted for from natural gas distribution systems.</ins>
  - (4) <ins>An assessment of whether alternate reporting and measures will resolve any safety issues identified under paragraph (3), including an analysis of the potential impact, including potential savings, on rate payers and end users of natural gas products of such reporting and measures.</ins>
- (c) <ins>Consideration of recommendations—</ins> <ins>If the Administrator determines that alternate reporting structures or recommendations included in the report required under subsection (a) would significantly improve the reporting and measurement of lost and unaccounted for gas or safety of systems, the Administrator shall, not later than 180 days after making such determination, issue regulations, as the Administrator determines appropriate, to implement the recommendations.</ins>

## Sec. 23 Comptroller General review of State policies relating to natural gas leaks — added

- (a) <ins>Review—</ins> <ins>The Comptroller General of the United States shall conduct a State-by-State review of State-level policies that—</ins>
  - (1) <ins>encourage the repair and replacement of leaking natural gas distribution pipelines or systems that pose a safety threat, such as timelines to repair leaks and limits on cost recovery from ratepayers; and</ins>
  - (2) <ins>that may create barriers for entities to conduct work to repair and replace leaking natural gas pipelines or distribution systems.</ins>
- (b) <ins>Report—</ins> <ins>Not later than 1 year after the date of the enactment of this Act, the Comptroller General shall submit to Congress and the Pipeline and Hazardous Materials Safety Administration a report summarizing the findings of the review conducted under subsection (a) and making recommendations on Federal or State policies or best practices that may improve safety by accelerating the repair and replacement of natural gas pipelines or systems that are leaking or releasing natural gas, including policies within the jurisdiction of the Pipeline and Hazardous Materials Safety Administration. The report shall consider the potential impact, including potential savings, of the implementation of its recommendations on ratepayers or end users of the natural gas pipeline system.</ins>
- (c) <ins>Consideration of recommendations—</ins> <ins>If the Comptroller General makes recommendations in the report submitted under subsection (a) on Federal or State policies or best practices within the jurisdiction of the Pipeline and Hazardous Materials Safety Administration, the Administrator shall, not later than 90 days after such submission, review such recommendations and report to Congress on the feasibility of implementing such recommendations. If the Administrator determines that the recommendations would significantly improve pipeline safety, the Administrator shall, not later than 180 days after making such determination and in coordination with the heads of other relevant agencies as appropriate, issue regulations, as the Administrator determines appropriate, to implement the recommendations.</ins>

## Sec. 24 Provision of response plans to appropriate committees of Congress — added

- (a) <ins>Provision of plans—</ins> <ins></ins>
  - (1) <ins>In general—</ins> <ins>Notwithstanding subsection (a)(2) of section 60138 of title 49, United States Code, and subject to paragraph (2), upon the request of the Chairperson or Ranking Member of an appropriate committee of Congress, the Administrator of the Pipeline and Hazardous Materials Safety Administration shall provide the Chairperson or Ranking Member, as applicable, a uniquely identifiable, unredacted copy of an oil response plan under that section.</ins>
  - (2) <ins>Protection of information—</ins> <ins>Any information subject to exclusion under section 60138(a)(2) of title 49, United States Code, that is provided under paragraph (1) shall be afforded appropriate protection against unauthorized public disclosure, consistent with the rules and practices related to the protection of confidential information received by Congress.</ins>
- (b) <ins>Rule of construction—</ins> <ins>Nothing in this section shall be construed as affecting the provision of any other report, data, or other information to Congress, or its handling thereof.</ins>

## Sec. 25 Consultation with FERC as part of pre-filing procedures and permitting process for new natural gas pipeline infrastructure — added

- <ins>Where appropriate, the Administrator of the Pipeline and Hazardous Materials Safety Administration shall consult with the Federal Energy Regulatory Commission during its pre-filing procedures and permitting process for new natural gas pipeline infrastructure to ensure the protection of people and the environment from the potential risks of hazardous materials transportation by pipeline.</ins>

## Sec. 26 Maintenance of effort — added

- <ins>Section 60107(b) is amended to read as follows:</ins>
- <ins>“(b) Payments—After notifying and consulting with a State authority, the Secretary may withhold any part of a payment when the Secretary decides that the authority is not carrying out satisfactorily a safety program or not acting satisfactorily as an agent. The Secretary may pay an authority under this section only when the authority ensures the Secretary that it will provide the remaining costs of a safety program, except when the Secretary waives this requirement.”</ins>

## Sec. 27 Aliso Canyon natural gas leak task force — added

- (a) <ins>Establishment of task force—</ins> <ins>Not later than 15 days after the date of enactment of this Act, the Secretary of Energy shall lead and establish an Aliso Canyon Task Force (referred to in this section as the “task force”).</ins>
- (b) <ins>Membership of task force—</ins> <ins>In addition to the Secretary, the task force shall be composed of—</ins>
  - (1) <ins>1 representative from the Pipeline and Hazardous Materials Safety Administration;</ins>
  - (2) <ins>1 representative from the Department of Health and Human Services;</ins>
  - (3) <ins>1 representative from the Environmental Protection Agency;</ins>
  - (4) <ins>1 representative from the Department of the Interior;</ins>
  - (5) <ins>1 representative from the Department of Commerce; and</ins>
  - (6) <ins>1 representative from the Federal Energy Regulatory Commission.</ins>
- (c) <ins>Report—</ins> <ins></ins>
  - (1) <ins>In general—</ins> <ins>Not later than 180 days after the date of enactment of this Act, the task force shall submit a final report that contains the information described in paragraph (2) to—</ins>
    - (A) <ins>the Committee on Energy and Natural Resources of the Senate;</ins>
    - (B) <ins>the Committee on Natural Resources of the House of Representatives;</ins>
    - (C) <ins>the Committee on Environment and Public Works of the Senate;</ins>
    - (D) <ins>the Committee on Transportation and Infrastructure of the House of Representatives;</ins>
    - (E) <ins>the Committee on Commerce, Science, and Transportation of the Senate;</ins>
    - (F) <ins>the Committee on Energy and Commerce of the House of Representatives;</ins>
    - (G) <ins>the Committee on Health, Education, Labor, and Pensions of the Senate;</ins>
    - (H) <ins>the Committee on Education and the Workforce of the House of Representatives;</ins>
    - (I) <ins>the President; and</ins>
    - (J) <ins>relevant Federal and State agencies.</ins>
  - (2) <ins>Information included—</ins> <ins>The report submitted under paragraph (1) shall include, at a minimum—</ins>
    - (A) <ins>an analysis and conclusion of the cause and contributing factors of the Aliso Canyon natural gas leak;</ins>
    - (B) <ins>an analysis of measures taken to stop the natural gas leak, with an immediate focus on other, more effective measures that could be taken;</ins>
    - (C) <ins>an assessment of the impact of the natural gas leak on health, safety, the environment, and the economy of the residents and property surrounding Aliso Canyon, on wholesale and retail electricity prices, and on the reliability of the bulk-power system;</ins>
    - (D) <ins>an analysis of how Federal, State, and local agencies responded to the natural gas leak;</ins>
    - (E) <ins>in order to lessen the negative impacts of natural gas leaks from underground storage facilities, recommendations on how to improve—</ins>
      - (i) <ins>the response to a future leak; and</ins>
      - (ii) <ins>coordination between all appropriate Federal, State, and local agencies in the response to the Aliso Canyon natural gas leak and future natural gas leaks;</ins>
    - (F) <ins>an analysis of the potential for a similar natural gas leak to occur at other underground natural gas storage facilities in the United States;</ins>
    - (G) <ins>recommendations on how to prevent any future natural gas leaks;</ins>
    - (H) <ins>recommendations on whether to continue operations at Aliso Canyon and other underground storage facilities in close proximity to residential populations based on an assessment of the risk of a future natural gas leak; and</ins>
    - (I) <ins>a recommendation on information that is not currently collected but that would be in the public interest to collect and distribute to agencies and institutions for the continued study and monitoring of natural gas storage infrastructure in the United States.</ins>
  - (3) <ins>Publication—</ins> <ins>The final report under paragraph (1) shall be made available to the public in an electronically accessible format.</ins>
  - (4) <ins>Findings—</ins> <ins>If, before the final report is submitted under paragraph (1), the task force finds methods to solve the natural gas leak at Aliso Canyon, finds methods to better protect the affected communities, or finds methods to help prevent other leaks, the task force shall immediately submit such findings to the entities described in subparagraphs (A) through (J) of paragraph (1).</ins>
- (d) <ins>Authorization of appropriations—</ins> <ins>There are authorized to be appropriated to carry out this section such sums as may be necessary.</ins>